Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42502 |
reduced the false failure rate at RF Stage. |
Udaybhan Mishra , 51009650 |
Ashish Kumar Patel , 51009176 |
We are facing high failure in Z35 Model at RF in LTE band 40 and 41 due to this production was getting hampered continuously which we can't maintain fpy this model. | Now we have change the test sequence in test plans at iqvector so that now reduced the false failure approx 2% | 05/2025 | ||
| 2 | LCIK - 43110 |
Reduced the false failure rate at RF Stage. |
Udaybhan Mishra , 51009650 |
Ashish Kumar Patel , 51009176 |
We are facing high failure in Yuva Smart 2 Model at RF in LTE band 40 and 41 due to this production was getting hampered continuously which we can't maintain fpy of this model . | Now we have change the test sequence in test plans at iqvector so that now reduced the false failure approx 2%. | 09/2025 | ||
| 3 | LCIK - 42466 |
REDUCED PARTS SCANNING TIME |
SUSHIL KUMAR YADAV , 51009383 |
chetan kumar , 51010411 Prashant Kumar , 51010676 |
Before implementation, The scanning time of single part was almost 18 seconds. Due to this high lead time almost all the parts were in hand to mouth condition and our SMT line was getting hamper again and again. | After Implementation done, part scanning time is reduced from 18 seconds to 5 seconds and now we have issue all material to production with in TAT. | 05/2025 | ||
| Previous 411 412 413 414 415 Next | |||||||||