Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 42502
reduced the false failure rate at RF Stage.
Udaybhan Mishra , 51009650
Ashish Kumar Patel , 51009176
We are facing high failure in Z35 Model at RF in LTE band 40 and 41 due to this production was getting hampered continuously which we can't maintain fpy this model. Now we have change the test sequence in test plans at iqvector so that now reduced the false failure approx 2% 05/2025
2 LCIK - 43110
Reduced the false failure rate at RF Stage.
Udaybhan Mishra , 51009650
Ashish Kumar Patel , 51009176
We are facing high failure in Yuva Smart 2 Model at RF in LTE band 40 and 41 due to this production was getting hampered continuously which we can't maintain fpy of this model . Now we have change the test sequence in test plans at iqvector so that now reduced the false failure approx 2%. 09/2025
3 LCIK - 42466
REDUCED PARTS SCANNING TIME
SUSHIL KUMAR YADAV , 51009383
chetan kumar , 51010411
Prashant Kumar , 51010676
Before implementation, The scanning time of single part was almost 18 seconds. Due to this high lead time almost all the parts were in hand to mouth condition and our SMT line was getting hamper again and again. After Implementation done, part scanning time is reduced from 18 seconds to 5 seconds and now we have issue all material to production with in TAT. 05/2025