Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43773 |
Reduction of Audio Failure Rate in T51 New Model through Manpower Training and Fixture Improvement |
Ravi Prakash Yadav , 51010012 |
Kunal Upadhyay , 51010611 |
In T51 new model, a high failure rate was observed at the Audio test process during initial production. After analysis, it was found that: Manpower handling was improper Fixture/jig usage was not correct Due to improper handling and fixture condition, audio failures were increasing This caused low efficiency and more rework | Corrective actions were taken: Proper training was given to manpower on handling and testing method Fixture/jig condition and working method were improved Standard method of operation was implemented As a result, the testing process became more stable. | 02/2026 | ||
| 2 | LCIK - 36357 |
Reduction in Rejection |
, 51009402 |
In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped. | In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped. Now added another FVI manpower before Curing stage. Now the excess glue could be detected beforehand and the excess glue can be reworked easily in wet glue stage. | 07/2022 | |||
| 3 | LCIK - 42754 |
Reducing One Screw from Sub Board Assembly in Q5008 |
Divya Saxena , 51010723 |
Ankit Sharma , 51010619 |