** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43773
Reduction of Audio Failure Rate in T51 New Model through Manpower Training and Fixture Improvement
Ravi Prakash Yadav , 51010012
Kunal Upadhyay , 51010611
In T51 new model, a high failure rate was observed at the Audio test process during initial production. After analysis, it was found that: Manpower handling was improper Fixture/jig usage was not correct Due to improper handling and fixture condition, audio failures were increasing This caused low efficiency and more rework Corrective actions were taken: Proper training was given to manpower on handling and testing method Fixture/jig condition and working method were improved Standard method of operation was implemented As a result, the testing process became more stable. 02/2026
2 LCIK - 36357
Reduction in Rejection
, 51009402
In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped. In battery cover assembly area, initially only 1 manpower deployed at FVI stage to check the cover visually. Observed that excess glue was present which wasn't pass and since it was dry, hence the cover had to be scrapped. Now added another FVI manpower before Curing stage. Now the excess glue could be detected beforehand and the excess glue can be reworked easily in wet glue stage. 07/2022
3 LCIK - 42754
Reducing One Screw from Sub Board Assembly in Q5008
Divya Saxena , 51010723
Ankit Sharma , 51010619
06/2025