Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 41167 |
Rejection control on assembly line |
Vipin kumar singh , 51008102 |
Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated. | If its validated properly after that run with proper analysis then safe to line losses and not hampered the line. | 08/2024 | |||
| 2 | LCIK - 40715 |
Rejection Control |
Saurav semwal , 51010353 |
Naripal Singh , 51010412 |
In Model YUVA 5G. ->We were getting scratches on Display due to ESD foam was not available at camera calibration jig, so scratches were getting generated. | 06/2024 | |||
| 3 | LCIK - 43173 |
Rejection control |
Durgesh kumar gupta , 51008626 |
Vishal , 51009466 |
Earlier we are facing MIC low issue from customer end,We can not detect mic low issue in jig by listening because there was judgement issue. | Now we added a checkpoint that mic volume should be above 50 DB,Because below the 50 DB coming mic low issue.After implement failure has been controlled,PCR has been raised to add the point in SOP. | 09/2025 | ||