** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41789
Quality improvement
, 51010512
we are facing high failure in Yuva 2 pro model at RF in band 40 and 41 due to this production was getting hampered continuously. now we have changed sequence of band 40 and 41 so that at starting time of lte firstly it will start from band 40 then band 1 ,3,8 41 due to this value fluctuation rate reduced at some extent label. 11/2024
2 LCIK - 42045
Quality Improvement
Akbar Ali , 51010494
Earlier We are using AIR ionizer to clean the router cutting dust due to this we are facing MIC foam damage issue .. Now we using ESD brass only to clean the router cutting dust ..after this control foam damage issue. 01/2025
3 LCIK - 41534
Quality improvement
Neeraj Mani Tripathi , 51009712
Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated. If its validated properly after that run with proper analysis then safe to line losses and not hampered the line. 09/2024
 Previous  390  391  392  393  394 Next