Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40859 |
RF Fail coming in high Qty in Model A3 Torch During NPI |
Ravi Prakash Yadav , 51010012 |
Prakash , 51009675 |
RF Fail coming in high Qty in Model A3 Torch During NPI. RF fail coming during NPI at RF Test Stage , After analysis found Pin uplift and poor connectivity issue coming from Antenna Pressing Machine. due to this, devices were coming fail during RF Test. | Now Improvement done in Antenna Pressing Machine and re-pressing done in All Devices after that passed all Devices and no issue coming during RF Test | 06/2024 | ||
| 2 | LCIK - 43402 |
Rf calibration flag down |
Janaki Ballav Pattanaik , 51009457 |
before we have faced 5% rejection RF calibration flag down issue in yuva2_5g which have no detection in SMT at any stage | Now at RF stage the after every GSM ,LTE,NR test the tool will validate the flag status after that no rejection found in assembly. | 11/2025 | |||
| 3 | LCIK - 42734 |
Rf calibration flag down |
RAVI KUMAR , 51009706 |
before we have faced 5% rejection RF calibration flag down issue in yuva2_5g which have no detection in SMT at any stage | Now at RF stage the after every GSM ,LTE,NR test the tool will validate the flag status after that no rejection found in assembly | 07/2025 | |||
| Previous 389 390 391 392 393 Next | |||||||||