** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 43022
RF Stage – scanner use in two system.
mohammad salman , 51010612
Sumant Kumar Yadav , 51009654
J.BASU , 51010276
At the RF stage, only 1 PC with 1 scanner was being used. Testing speed and flexibility were limited due to dependency on a single setup. Any failure or downtime of this scanner/PC created delays in testing flow. High dependency on individual hardware (scanner, mouse), leading to resource bottlenecks. Improvement Implemented (After) Enabled remote configuration to connect multiple PCs with a single scanner and mouse. Now, 2–3 PCs can simultaneously be operated through one scanner and one mouse. Simplified hardware layout at the RF stage, reducing clutter and dependency. 08/2025
2 LCIK - 42380
RF report In SPRD feature phone.
Anuj Kumar Yadav , 51008899
SANJAY RUPANI , 51009511
Udaybhan Mishra , 51009650
In feature phones Sprd Model RF report is not generated as SN2 write to the device and IMS report is generated by SN1. Now we have changed the mes dashboard to view the RF report by SN2. And we can track the FPY and failure by generating the report through mes dashboard. 04/2025
3 LCIK - 37097
RF Port se
Dharmendra kumar , 165595
Sandeep kumar , 165594
Chanddev kumar , 165593
10/2022
 Previous  383  384  385  386  387 Next