Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43022 |
RF Stage – scanner use in two system. |
mohammad salman , 51010612 |
Sumant Kumar Yadav , 51009654 J.BASU , 51010276 |
At the RF stage, only 1 PC with 1 scanner was being used. Testing speed and flexibility were limited due to dependency on a single setup. Any failure or downtime of this scanner/PC created delays in testing flow. High dependency on individual hardware (scanner, mouse), leading to resource bottlenecks. | Improvement Implemented (After) Enabled remote configuration to connect multiple PCs with a single scanner and mouse. Now, 2–3 PCs can simultaneously be operated through one scanner and one mouse. Simplified hardware layout at the RF stage, reducing clutter and dependency. | 08/2025 | ||
| 2 | LCIK - 42380 |
RF report In SPRD feature phone. |
Anuj Kumar Yadav , 51008899 |
SANJAY RUPANI , 51009511 Udaybhan Mishra , 51009650 |
In feature phones Sprd Model RF report is not generated as SN2 write to the device and IMS report is generated by SN1. | Now we have changed the mes dashboard to view the RF report by SN2. And we can track the FPY and failure by generating the report through mes dashboard. | 04/2025 | ||
| 3 | LCIK - 37097 |
RF Port se |
Dharmendra kumar , 165595 |
Sandeep kumar , 165594 Chanddev kumar , 165593 |
10/2022 | ||||
| Previous 383 384 385 386 387 Next | |||||||||