Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 41522 |
Quality improvement |
ashish kumar , 51009704 |
Power key hard press issue observed due to Power key/Finger sensor key assembled in reverse direction (Found FPC twisted or rolled) because of process not defined properly. | SOP modified with defined process to prevent unnecessary rejection (Added or defined process:- FPC half twist in clockwise direction). | 09/2024 | |||
2 | LCIK - 41778 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Mixing of TPU cover for increasing the capacity but causing defects like dent, peel off of paint, improper fitment. | Less modification in jigs platforms, non mixing of TPU covers online. Increase in UPH. | 11/2024 | |||
3 | LCIK - 41779 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Earlier torch pad have less solder due to this torch key failure in Assembly. | Now we have modified the stencil by step up design to 0.47 mils by which we have reduced the both failure. before-0.02% after-0.01% | 11/2024 | |||
Previous 381 382 383 384 385 Next |