Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 41251 |
Quality improvement |
Manish prajapati , 51010516 |
we can remove any TP LCD smart phone that gets scraped for minor scratches or dents, we can remove it by making a refurbished phone for the employee or we can control the use of any TP LCD scrap that is done by this company. | Now we are running a model called Blaze Curve which has a lot of scratches or dents in it so we are going to make a refurbished phone for the employee so that the company will have less loss. | 08/2024 | |||
2 | LCIK - 41252 |
Quality improvement |
Manish prajapati , 51010516 |
Loopback test chamber is not yet installed on the third floor due to which there is a possibility of line speaker crack bypass. | Loopback chamber is used to do loopback tests on 1st floor. If loopback test chamber is also installed on 3rd floor then the operator will not have any problem with the sound coming from the tab line or it will easily cause failure like Speaker's creak voice and Speaker's low. You will be able to check. | 08/2024 | |||
3 | LCIK - 41508 |
Quality improvement |
Krishna Kumar Singh , 51010395 |
Before soldering jig so light that soldering manpower paste the .paper so that jig does not move but when changeover do then manpower remove the paper and gum marks comes on the mat. | When we will add a vacuum rubber then the soldering jig automatics paste with the mat as well as soldering jig do not move and when we remove the soldering jig then gum mark not come and problem solve. | 09/2024 | |||
Previous 370 371 372 373 374 Next |