** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41759
Quality improvement
Krishna Kumar Singh , 51010395
There is no line cable connection in the vendor room on 3rd floor due to which sap does not work in the IQC system and for booking the vendor part the IQC person has to come to the 1st floor Due to which the does not book vendor part on time and it takes time to fill the recco in the last hour If line cable connection is installed in the vendor room or a system with wifi is provided for the vendor room, the vendor will be booked on part time and there will be no problem in filling the line records 11/2024
2 LCIK - 39713
Quality improvement
Anuj Kumar , 51009497
Shiv Shankar , 51010246
Pawan Kumar , 51009498
Till now there is no any scratch protection film are using on line to protect the scratch mark on the battery cover of the smart phone But in Blaze curve model there is a battery protection film will be used for the scratch protection on this battery cover. 02/2024
3 LCIK - 41761
Quality improvement
Krishna Kumar Singh , 51010395
we are facing high failure in Yuva 2 pro model at RF in band 40 and 41 due to this production was getting hampered continuously. now we have changed sequence of band 40 and 41 so that at starting time of lte firstly it will start from band 40 then band 1 ,3,8 41 due to this value fluctuation rate reduced at some extent label. 11/2024
 Previous  367  368  369  370  371 Next