Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 39941 |
![]() Quality improvement |
Sachin Vishwakarma , 51010248 |
Some material are coming on floor with china part code, not in lava part code. We are facing problem during material counting before shift start because lava part code mention on BOM sheet and china part code mention on material. some time wrong material also come in kit but we can not verify with part code and result wrong fitment in handset and till end we face production loss. | If Lava part code will mention on material then we can easily check and verify during material counting and no chance of wrong material forward in assembly and also no chance of wrong fitment | 03/2024 | |||
2 | LCIK - 40199 |
![]() Quality improvement |
Sumit , 51009949 |
At present there is no any checkpoint for main lens clean bypass. | Checkpoint provided to check for main lens is properly cleaned or not in wallpaper pasting stage. | 04/2024 | |||
3 | LCIK - 41224 |
Quality improvement |
Neeraj Mani Tripathi , 51009712 |
Earlier we pack the battery cover just after the FVI and due to environmental dust ,some partials of dust are stay at the surface of battery cover . Which is also a possible cause of increasing dust count at shop floor | 08/2024 | ||||
Previous 357 358 359 360 361 Next |