Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43236 |
Safety of ESD |
Vipin kumar singh , 51008102 |
We have observed on toilet room for both floor (1st & 3rd Floor) on toilet gate already provide normal sleeper for using at toilet room but all operator are not use that's sleeper directly entry with ESD sleeper. So no meaning of where kept normal sleeper. | If we have for suggestion and understand to why use normal sleeper in toilet room can hold a instruction board on that place then all are operator read and follow the process easily. | 10/2025 | |||
| 2 | LCIK - 43235 |
Safety of accident |
Vipin kumar singh , 51008102 |
If any cause like that miss handling by battery damaged or burn then operator afraid and he don't know that time what he do? or which fire safety equipment are available on floor and how to use for that. | If we have provide a proper training related to fire safety and which equipment available on floor and how to use then easily provide the safety. Its training provide every month of end because manpower is not stable. | 10/2025 | |||
| 3 | LCIK - 37079 |
Safety issue from air pipe |
, 64986 |
Sharan Ojha , 59383 Subhash chandra , 51009482 |
10/2022 | ||||
| Previous 352 353 354 355 356 Next | |||||||||