Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38909 |
![]() Qulity imrovement |
Sujeet kumar mishra , 51009224 |
08/2023 | |||||
2 | LCIK - 38910 |
![]() Qulity imrovement |
Sujeet kumar mishra , 51009224 |
The front camera on the TP/LCD assembly line used to have the masking TAP installed after the FVI, causing dust to enter the front camera on the line. Model-Yuva 2 TP/LCD | Now after assembling the TP/LCD, we are putting the masking TAP so that dust does not enter the front camera. Model-Yuva 2 TP/LCD | 08/2023 | |||
3 | LCIK - 37726 |
![]() Qulity improvement |
Vinod kumar pal , 44265 |
, 40858 , 40025 |
There is no water mat near the water cooler on the 1st floor, due to which water is spread all over the floor. Even 6s is not correct with this. | If a water mat is placed near the water cooler on the 1st floor, then water will not spread on the floor. And Due to this 6s will also be correct. | 01/2023 | ||
Previous 335 336 337 338 339 Next |