Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43538 |
Sap t code devlop for MRN posting from IMS ZM2M_BATCH to batch new T code develop for MRN posting |
SUSHIL KUMAR YADAV , 51009383 |
Previously, we using to manually batch change each part one by one line item in SAP. This process was time-consuming and took more than one hour to clearing the MRN posting to store | Now we are collaborating with the SAP team to develop the ZM2M_BATCH_CHANG T-code, which will provide a batch of all parts in a single run and all MRN posting one shot | 01/2026 | |||
| 2 | LCIK - 42701 |
Sap T code develop for report (ZPP_BOM_N) |
SUSHIL KUMAR YADAV , 51009383 |
chetan kumar , 51010411 Prashant Kumar , 51010676 |
Previously, we used to manually check each tool one by one with the help of FG code line item in SAP. This process was time-consuming and took more than one hour to find the report. | We are collaborating with the SAP team to develop the ZPP_BOM T-code, which will provide a comprehensive report of BOM parts in a single run. This will greatly enhance our reporting capabilities. | 07/2025 | ||
| 3 | LCIK - 41655 |
SAP T Code Implants |
Dimple Kumar , 52392 |
Chandana Malika , 30158 |
SAP Long process to transfer materials plant to plant materials create Invoice after GRN materials reflect other plant location | after we take the movement of SAP tcode of MB1B Movement 301 and one time transfer materials to plant to plant location save the time and issue materials to production | 10/2024 | ||
| Previous 333 334 335 336 337 Next | |||||||||