Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 41159 |
Receiver added to the software of Model A1 Vibe |
Ankur Sharma , 51010504 |
Model A1 Vibe software test receiver is not checking in , receiver is fine and definitely not detected. | Now we have added the receiver in the software of A1 Vibe model, which now detects the receiver as OK, NG. | 08/2024 | |||
2 | LCIK - 39503 |
![]() Reball pcba tracking |
Sandeep Kumar , 51009771 |
Earlier we used to send Reboll Pcba with the fg due to which we had more assembly failures and we did not know whether it was OK pcba failure or Reboll. | Now we send the Rebol PCBA separately whose failure is detected | 01/2024 | |||
3 | LCIK - 41047 |
![]() RBW marking position changed in PCBA in A3 Torch project. |
Pawan Kumar , 51009498 |
Gange Naresh , 51009421 | In before situation, RBW marking was parallel with soldering pad of speaker due to this when operator was soldering the speaker, solder pad was getting covered with paste and operator get confused which one need to solder on next pad, so these create the issue of Speaker wrong soldering. | In after situation, RBW marking shifted at Bottom side of soldering pad, now operator can clearly see the color marking of RBW after soldering (tinning) process, which avoid the failure of Speaker . | 07/2024 | ||
Previous 333 334 335 336 337 Next |