Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 39905 |
![]() reduce sim fail |
Kartik Rautela , 55955 |
Raj kamal yadav , 51008653 Ashish Kr Singh , 55586 |
DUE TO SIM PIN BEND WE HAVE OBSERVED 0.5% REJECTION OF SIM FAIL IN A7 TORCH | NOW WE HAVE ADDED TAPE AT STENCIL TO IMCREASE THE HEIGHT OF THE PASTE AT SIM PAD ..EARLIER 90 um WAS THE HEIGHT WHICH IS INCREASED TO 150. | 03/2024 | ||
2 | LCIK - 38126 |
![]() Reduce SCRAP Value |
, 57676 |
Rahul MahaKud , 166030 |
If there is a stacking level to keep the material on the material trolley that would have been in the packing, then the material will not get scraped by fall. | 02/2023 | |||
3 | LCIK - 38967 |
![]() Reduce One Man power on line |
Neeraj Mani Tripathi , 51009712 |
In previous run we used one MP at the stage of battery cover binding with jig. This process add for tracking of NG jigs if any Battery cover uplift found at FVI stage . | After discussed in PFMA meeting in Blaze pro -5G that we will used one MP at this stage for only first 10K production and after that according the FVI result we will remove that MP . Now we find FVI result positively so now can removed one MP from that stage | 10/2023 | |||
Previous 328 329 330 331 332 Next |