** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41416
Reduce the P Sensor failures.
Raj kamal yadav , 51008653
Rohit dwivedi , 51008107
Kartik Rautela , 55955
Earlier we were facing high P sensor failures issue ,2.0 % In Model- Blaze X MB. Now we have increased the stencil aperture from 4.5 mil to 8.5 mil for increase the solder at the PCBA Pad,After that failure controlled. 08/2024
2 LCIK - 38014
Reduce Test time in N31 Audio Tool
SANJAY RUPANI , 51009511
Anuj Kumar Yadav , 51008899
Saba Anwar , 51009386
Earlier, when the speaker test failed in neckband audio testing,tool used to check other parameters as well, due to which the testing time increased. Later we added an option to test in sequence, which will stop the test if any parameter fail, due to which reduced our test cycle time. 02/2023
3 LCIK - 39261
Reduce Test time in N11 Audio Tool
SANJAY RUPANI , 51009511
Anuj Kumar Yadav , 51008899
Saba Anwar , 51009386
Earlier in neckband audio testing, if the speaker test failed, the tool was used to check other parameters also, which increased the testing time. Later we added an option to test in sequence, which would stop testing if any parameter failed, which reduced our testing cycle time. 12/2023
 Previous  327  328  329  330  331 Next