Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39356 |
Scrap Handling |
Ankur yadav , 51010078 |
Vikky Raj , 30091 NITIN KUMAR SINGH , 370488 |
1.There is no specified location define to hold the scrap material of the shift. 2. Material always hold on floor until the scrap paper not booked. | 12/2023 | |||
| 2 | LCIK - 42714 |
Scrap controll |
Pradeep pal , 51008628 |
On SMT Mounter stage Many times By mistake part Reels going in dustbin without used due to to No any check point to checking Reels after used due to this Oprator throwing Many Parts Reels one time in dustbin | Now we Are implemented a process for Reel Cutting of used empty Reels Oprator cutting every Reels after used and then throw in in dustbin after implemented this process we are found to control of Part Reel throwing in dustbin | 07/2025 | |||
| 3 | LCIK - 37270 |
Scheduller setup for nokia |
rajan kumar pandey , 51009749 |
chandra shekhar , 51009333 khairul alam , 51008843 |
Before team using scheduller at stage phase check without files path modification earlier due to this process changeover time is high at this stage. | Now we create all logs path in one folder and paste in D/ drive so no need to modify during changeover. | 11/2022 | ||
| Previous 325 326 327 328 329 Next | |||||||||