Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 36743 |
![]() REJECTION TAG |
Harish Chandra , 372295 |
Abhay prajapati , 81338 |
LINE NO.2 PAR RED TRAY REJECTION TAG NHI THA . | LINE NO. 2 SOFTWARE STAGE PAR RED TRAY REJECTION TAG LAGAYA..... | 08/2022 | ||
2 | LCIK - 41167 |
![]() Rejection control on assembly line |
Vipin kumar singh , 51008102 |
Repair team decide that part is vendor rejection or sometime issue then vendor how decide its not a fault and part left on the once again in line. When run on line this part then its rejection once again found in repair so hampered the line for same issue repeated. | If its validated properly after that run with proper analysis then safe to line losses and not hampered the line. | 08/2024 | |||
3 | LCIK - 40715 |
![]() Rejection Control |
Saurav semwal , 51010353 |
Naripal Singh , 51010412 |
In Model YUVA 5G. ->We were getting scratches on Display due to ESD foam was not available at camera calibration jig, so scratches were getting generated. | 06/2024 | |||