Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 40801 |
![]() repair handset safe for dust particle. |
Rajneesh kumar , 51010373 |
The net installed at the repair stage should have a full plate instead of the net because there is a packing stage next to the repair and due to the gift box, a lot of dust is created so that the dust particles come in the display or the repair stage should be removed from the packing and shifted to another place so that the repair handset does not get dust. | 06/2024 | ||||
2 | LCIK - 40914 |
![]() Repair Bin Moved here and where |
Mukesh Mishra , 51009471 |
07/2024 | |||||
3 | LCIK - 38265 |
![]() Repair area is to congested and small. |
Mukesh Mishra , 51009471 |
Third floor repair area have no space. because two department work together in small office area. many time our material are miss and always data mismatch to material gap issue. but we have no space to other activity. | we have separate office area in third floor to done batter work. When we have space in third floor repair office area. so we done our work proper. no any other are disturb us to during the work. and our material also have in save area. | 03/2023 | |||
Previous 317 318 319 320 321 Next |