Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 41977 |
rf flag detection |
Kartik Rautela , 55955 |
Raj kamal yadav , 51008653 Ashish Kr Singh , 55586 |
before we have faced 5% rejection rf calibration flag down issue in yuva2_5g , which have no detection in teh smt at any stage | Now at rf stage the after every GSM ,LTE,NR test the tool will validate the flag status .after that no rejection found in assembly | 01/2025 | ||
2 | LCIK - 39428 |
![]() RF Fail Issue Resolve |
Anuj Kumar , 51009497 |
Sandeep Pathak , 51010189 Shiv Shankar , 51010246 |
In the S33 & E13 5G model there was a problem of RF fail. the cause of this problem was a foam not pasted on the middle cover and speaker bracket. So we observed the cause of this problem and added total 4 foam on middle cover and the speaker bracket of the both models. due to this one additional man pawer was using for this activity. | But in the new shipment of the both models the foam is coming pre pasted from the vendor end itself. therefore we saved that one manpower in both Models. | 12/2023 | ||
3 | LCIK - 39728 |
![]() Rf Fail decreased in sub pcba |
Rohit dwivedi , 51008107 |
Kartik Rautela , 55955 , 40004 |
there is no test point in sub pcba for rf testing so without detection we can not take any action on it | we add a coupler check & antenna check point at the visual stage .and ensure if any failure found at rf stage then mention the rf failure bend . | 02/2024 | ||
Previous 310 311 312 313 314 Next |