** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 37378
Rf jig modifie for current test
Saroj kumar kar , 51006585
Mohd Farzan , 51009674
Sumant Kumar Yadav , 51009654
We are use rf jig only rf stage. After modification we are use rf jig rf stage and current stage both. 11/2022
2 LCIK - 37600
RF jig modification in BLAZE 5G for easiness in buckling RF connector.
Abhin Manra , 51009366
Pawan Kumar , 51009498
In previous process RF cable buckling was done separately. Single RF cable operated with single jig causing operator consuming more time. In present process RF cable buckling divided as both RF cables will be buckled at sub PCBA side first , then at main PCBA side. 11/2022
3 LCIK - 42079
rf flag detection
Pawan Kumar Yadav , 51010085
Vishal , 51009466
before we have faced 5% rejection rf calibration flag down issue in yuva2_5g , which have no detection in teh smt at any stage Now at rf stage the after every GSM ,LTE,NR test the tool will validate the flag status .after that no rejection found in assembly 01/2025
 Previous  309  310  311  312  313 Next