Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43948 |
X-OUT PCB Location Define |
Dimple Kumar , 52392 |
Lawkush ram , 44960 |
ok and X-OUT PCB Location same physicals vs SAP storage Bin there is difficulty to share reports x-out | X-out PCB location define to Separator physicals verification X-out and share reports to PPC timely | 04/2026 | ||
| 2 | LCIK - 40330 |
X RAY ROOM TEMPERATURE MAINTAINED |
Pawan Kumar Yadav , 51010085 |
Vinod sapehia , 51008613 |
X RAY TEMPERATURE WAS VERY HIGH AND ALSO AC NOT WORKING ON NON PRODUCTION TIME WHICH IS OK AS PER X RAY REQUIREMENT ..THIS WAS CREATING X RAY BREAKDOWN ISSUE | NOW ONE AC IS INSTALLED IN X RAY TO MAINTAIN THE X RAY TEMPERATURE..THIS WILL DECREASE THE BREAKDOWN AND OTHER ISSUE IN MACHINE | 05/2024 | ||
| 3 | LCIK - 43091 |
X OUT PCB CREATED LOCATION IN SAP |
SUSHIL KUMAR YADAV , 51009383 |
Shivakar Choudhary , 166857 |
X Out pcb and ok PCB mixed laying in one location so very difficult to share x out data to ppc for plan update | After X OUT PCB separate location created and Flash reports as per X OUT .as per location and share to pc for plan update easily | 09/2025 | ||
| Previous 29 30 31 32 33 Next | |||||||||