** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 39664
shorting issue resolve in assembly in moto A50G
Ashish Kr Singh , 55586
Raj kamal yadav , 51008653
Kartik Rautela , 55955
02/2024
2 LCIK - 43851
Shorting issue coming in Charger LIAC005
Rahul chand , 51008627
Lalit Mohan Joshi , 51009697
Dharmendra kumar yadav , 51009109
We are facing shorting issue in diode in assembly 03/2026
3 LCIK - 43258
Shorting failure improved through Stencil updated
Rohit dwivedi , 51008107
Kartik Rautela , 55955
Raj kamal yadav , 51008653
Frequent shorting failures observed on fine-pitch components (e.g. CPU, PMIC). Shorting rate: 0.8% of total boards (~80 PPM). SPI showing volume >130% on critical pads. Existing stencil: thickness 0.12 mm, aperture 1:1 ratio (no reduction). Rework and inspection time were high, affecting line productivity. Stencil aperture reduced by 10–15% (modified to 0.1 mm effective opening). Added home plate design for fine-pitch pads. SPI average volume reduced to 95–105% (within target). Shorting failure reduced from 0.8% → 0.05% (80→5 PPM). Line productivity improved by ~3% due to reduced rework. 10/2025
 Previous  299  300  301  302  303 Next