Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 36472 |
![]() Safety |
Sujit kumar Pandey , 51009483 |
Operators used to switch off the main power MCB of the air shower at first floor with their feet while coming to the air shower during shift start and lunch time, due to which the air shower did not work. | 08/2022 | ||||
2 | LCIK - 38037 |
![]() Safety |
, 64799 |
Electrical cable was laid on floor in security check point. which was unsafe and chance to cut. | Now cable have laid inside pvc conduit. this is safe condition. | 02/2023 | |||
3 | LCIK - 41639 |
Safety |
Sujit kumar Pandey , 51009483 |
10/2024 | |||||