Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 38450 |
Smt in between line 1 & 2 expansion joint new SS sheet installed. |
Praveen kumar , 51009477 |
Sharan Ojha , 59383 , 59296 |
03/2023 | ||||
| 2 | LCIK - 43830 |
SMT component Reservation report developed in ims |
SUSHIL KUMAR YADAV , 51009383 |
Before We are manual kit verification of smt component kits Which is taking every kit minimum 40-50 min | 03/2026 | ||||
| 3 | LCIK - 42374 |
SMT cailibration check point added at RF stage |
Ashish Kumar Patel , 51009176 |
Udaybhan Mishra , 51009650 |
Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT cailibration by pass in assembly line from testing side, so OQA team found SMT cailibration bypass, due to this oqa team stop the line | As per quality and production requirment we have discussed with vendor and added checkpoint sequence in tool. SMT calibration checkpoint added at RF stage. also we have cheked SMT calibration bypass devices. at the stage tool working fine. | 04/2025 | ||