Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 40973 |
![]() Scrap Material Area production 1st Floor covered by CCTV Camera |
Vipin kumar singh , 51008102 |
Made a Scrap Material area and install a Scrap Duct from Workshop for scrap material and material is sending directly in Scrap Room with help of Scrap Duct. Due to Which time is saving and work is become very smooth. There is no any CCTV camera for safety if some costly material skip by house keeping person from there. So, Need To Install a CCTV Camera For Safety. | Now made a Scrap Material area and install a Scrap Duct from Workshop for scrap material and material is sending directly in Scrap Room with help of Scrap Duct,Due to Which time is saving and work is become very smooth. There is no any CCTV camera for safety if some costly material skip by house keeping person from there. So, Need To Install a CCTV Camera For Safety. | 07/2024 | |||
2 | LCIK - 39356 |
![]() Scrap Handling |
Ankur yadav , 51010078 |
Vikky Raj , 30091 NITIN KUMAR SINGH , 370488 |
1.There is no specified location define to hold the scrap material of the shift. 2. Material always hold on floor until the scrap paper not booked. | 12/2023 | |||
3 | LCIK - 37270 |
![]() Scheduller setup for nokia |
rajan kumar pandey , 51009749 |
chandra shekhar , 51009333 khairul alam , 51008843 |
Before team using scheduller at stage phase check without files path modification earlier due to this process changeover time is high at this stage. | Now we create all logs path in one folder and paste in D/ drive so no need to modify during changeover. | 11/2022 | ||
Previous 267 268 269 270 271 Next |