** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 38900
Smt testing Esd and Body Earthing connected by earth link
Sharan Ojha , 59383
Subhash chandra , 51009482
As before smt testing area body earth and esd earth is connected loose type open wire. This tipe wire facing every time new connection and and loose wire, also maximum quantity wire use every time. 08/2023
2 LCIK - 41887
SMT Store freezer alarm hooter installed
Dimple Kumar , 52392
Chandana Malika , 30158
SMT Store freezer no alarm hooter installed before CTP temp. increase of 2 To 8 degree alarm hooter has been installed. The materials of T4 & T5 , glue water whose temperature is 2 C to 8 C degrees. When the temperature increases by 8C The hooter sounds of beep. to maintain the temperature. 12/2024
3 LCIK - 39851
SMT Store freezer alarm hooter installed
Dimple Kumar , 52392
Chandana Malika , 30158
Nand kumar , 51009969
SMT Store freezer no alarm hooter installed alarm hooter has been installed. The materials of T4 & T5 , glue water whose temperature is 2 C to 8 C degrees. When the temperature increases by 8C The hooter sounds of beep. to maintain the temperature. 03/2024
 Previous  245  246  247  248  249 Next