Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38450 |
![]() Smt in between line 1 & 2 expansion joint new SS sheet installed. |
Praveen kumar , 51009477 |
Sharan Ojha , 59383 , 59296 |
03/2023 | ||||
2 | LCIK - 42374 |
SMT cailibration check point added at RF stage |
Ashish Kumar Patel , 51009176 |
Udaybhan Mishra , 51009650 |
Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT cailibration by pass in assembly line from testing side, so OQA team found SMT cailibration bypass, due to this oqa team stop the line | As per quality and production requirment we have discussed with vendor and added checkpoint sequence in tool. SMT calibration checkpoint added at RF stage. also we have cheked SMT calibration bypass devices. at the stage tool working fine. | 04/2025 | ||
3 | LCIK - 40274 |
![]() SMD Component lead short due to space constraint |
Pawan Kumar , 51009498 |
Saurav semwal , 51010353 Gange Naresh , 51009421 |
In before situation, Due to space constraints in PCBA chance of SMD component damage. | In after situation, proposed to Provide Heat sink mylar ,lead to avoid component damage while soldering | 04/2024 | ||