** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 38450
Smt in between line 1 & 2 expansion joint new SS sheet installed.
Praveen kumar , 51009477
Sharan Ojha , 59383
, 59296
03/2023
2 LCIK - 42374
SMT cailibration check point added at RF stage
Ashish Kumar Patel , 51009176
Udaybhan Mishra , 51009650
Model YUVA 2 5G was running in assembly line on last time. no any checkpoint of SMT cailibration by pass in assembly line from testing side, so OQA team found SMT cailibration bypass, due to this oqa team stop the line As per quality and production requirment we have discussed with vendor and added checkpoint sequence in tool. SMT calibration checkpoint added at RF stage. also we have cheked SMT calibration bypass devices. at the stage tool working fine. 04/2025
3 LCIK - 40274
SMD Component lead short due to space constraint
Pawan Kumar , 51009498
Saurav semwal , 51010353
Gange Naresh , 51009421
In before situation, Due to space constraints in PCBA chance of SMD component damage. In after situation, proposed to Provide Heat sink mylar ,lead to avoid component damage while soldering 04/2024
 Previous  240  241  242  243  244 Next