** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 36764
SN NUMBER CHECK
khairul alam , 51008843
Ashish Kumar , 51009464
Sumant Kumar Yadav , 51009654
1.Before there are no phase check in model shadowcat. 2.in case of pcba mismatch pcba outflow from smt 1.Now there are a phase check in model shadowcat. 2.in case of pcba SN mismatch is detected at stage phasecheck 08/2022
2 LCIK - 37931
SMT Testing Side Tub lite issue
MANEESH SINGH , 44796
YOGESH KUMAR , 44540
JAGDISH VERMA , 44741
please replace onther location system looking clear 02/2023
3 LCIK - 38900
Smt testing Esd and Body Earthing connected by earth link
Sharan Ojha , 59383
Subhash chandra , 51009482
As before smt testing area body earth and esd earth is connected loose type open wire. This tipe wire facing every time new connection and and loose wire, also maximum quantity wire use every time. 08/2023
 Previous  237  238  239  240  241 Next