Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38672 |
![]() Software standardization in Blaze 2 Pro |
Abhin Manra , 51009366 |
Pawan Kumar , 51009498 |
ODM shared as per there FT sequence which was different from Lava models FT sequence. Chances of item test miss. | Practice on lava Models FT sequence having minimum chance of skippage. | 05/2023 | ||
2 | LCIK - 41387 |
Software Improvements in Model Yuva 2 5G Camera calibration |
Ankur Sharma , 51010504 |
The camera calibration test in Model Yuva 2 5G was not a full test but a single test which could not be checked through the online system whether the camera calibration was pass or fail. | We talked to the SW team and got the camera calibration test flag added to the full test, which now detects camera calibration pass and fails in the online system. | 09/2024 | |||
3 | LCIK - 40812 |
![]() Software Improvements in Model K80 |
Ankur Sharma , 51010504 |
Main and Sub Mic test is not available with DB parameters which should be auto pass if DB parameters will be matched not available in this software version V01 model K80 | So we have talked to the software team and asked them to improve the next software. | 06/2024 | |||
Previous 230 231 232 233 234 Next |