Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 38334 |
![]() SOP Change |
, 51008095 |
Abhishek kumar , 165304 |
In model 34 Ultra we are using three part code LCD in all LCD we are pasting LCD foam and Conductive foam in one part code LCD have steel back and 2 part code LCD don't have steel back cover,. | Now which LCD have steel back while this part code LCD will run on line in which LCD foam and Conductive foam will be not past on line due to this now we have save two manpower on line which we can use another line or can multiskilling | 03/2023 | ||
2 | LCIK - 36839 |
![]() SOP Change |
Abhishek kumar , 165304 |
gem power men past IMEI label stage pe SSI screw seal diya hai jabki screw seal IMEI label stage ke bad lagta hai, jo ki posibal nahi hai | Screw seal SSI IMEI label stage se hata kar insert battery sage pe de diya jaye | 09/2022 | |||
3 | LCIK - 36840 |
![]() SOP Change |
Abhishek kumar , 165304 |
GULSHAN KUMAR , 44378 |
At FVI stage we use the golden sample of every model, many time we forgot to put golden sample on line due to this the operator could not detect the defect easly | Now we are update the image of golden sample of every model in IMES now we don't have need of golden sample, if we forgot put the golden sample on line then the operator cane easly detect the difect | 09/2022 | ||
Previous 224 225 226 227 228 Next |