Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39530 |
Yuva 3 FT manpower optimization |
Amit Pratap Singh , 51009908 |
Before the process was as per given below 1. P/L sensor, Gravity sensor and finger print sensor test 2. Gsensor calibration and magnetic sensor test & GPS test Before total FT manpower was 15 | Now we merged both process & saved 1 M/P P/L sensor test, Gravity sensor Test, Finger print test & G sensor Calibration, magnetic sensor test & GPS test ( 1 M/P ) Now FT manpower is 14 & same we will implement in other similar smart phone | 01/2024 | |||
| 2 | LCIK - 40939 |
Yuva 2 pro Line Balance |
Sachin yadav , 51009625 |
By getting the battery scanned at the battery pressing stage, both the stages will be balanced. | Model- Yuva 2 pro Stage- Unpack Battery & Scan Battery Fix Battery Connector & Fix Battery Scanning also had to be done at the battery fixing stage due to which accumulation takes place | 07/2024 | |||
| 3 | LCIK - 40690 |
Yuva 2 pro Line Balance |
ashish kumar , 51009704 |
ASIT KUMAR , 30148 |
Model- Yuva 2 pro Stage- Unpack Battery & Scan Battery Fix Battery Connector & Fix Battery Scanning also had to be done at the battery fixing stage due to which accumulation takes place | By getting the battery scanned at the battery pressing stage, both the stages will be balanced | 06/2024 | ||
| Previous 19 20 21 22 23 Next | |||||||||