Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 43015 |
Space is Productivity – Use it Wisely |
Vivek Gupta , 51010662 |
Anil Kumar chaursiya , 51010623 Kunal Upadhyay , 51010611 |
There was no available space on the assembly line to accommodate the camera feature phone process. | A through analysis of space requirements revealed an unused block at the FT (Functional Testing) side that was not being utilized effectively. The empty block was modified and adjusted in collaboration with the repair team. This created additional space on the FT side, allowing the assembly line to run the camera feature phone smoothly. | 08/2025 | ||
| 2 | LCIK - 38280 |
Space free from c drive monthly basis |
rajan kumar pandey , 51009749 |
Ashish Kumar , 51009464 chandra shekhar , 51009333 |
Before we are not cleaning c drive useless data from pc on monthly basis. After c drive full team removes pc from line and format by it team. | Now we are cleaning c drive useless log from pc on monthly basis. | 03/2023 | ||
| 3 | LCIK - 39506 |
Space enhancement in Receiving store for material storage |
Dimple Kumar , 52392 |
CHANDANA MALIKA , 44659 |
The compactor was placed in the receiving store which took up more space. | We removed the compactor and increased the space for storing materials. | 01/2024 | ||
| Previous 205 206 207 208 209 Next | |||||||||