Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 40012 |
Test sequence for led test updated in tool in first location . |
RAVI SHARMA , 51009539 |
Before led glowing at 32th sequence in the tool, during this location operator facing visibility issue during manual test. | Now sequence updated at 1st location.Due to this implementation manually identification is easy for led test because first led is glowing due to tool modification. | 04/2024 | |||
| 2 | LCIK - 40015 |
Test sequence for led test updated in tool in first location . |
SOMSHANKAR PATEL , 51009707 |
Before led glowing at 32th sequence in the tool, during this location operator facing visibility issue during manual test. | Now sequence updated at 1st location.Due to this implementation manually identification is easy for led test because first led is glowing due to tool modification. | 04/2024 | |||
| 3 | LCIK - 38721 |
Test Battery Machine |
Amit Kumar Prajapati , 51009104 |
There is no test machine to check test battery on line | There should be a machine to test the test battery on the line. So that OK and NG battery can be detected Due to which only ok test battery will run on line par which will improve productivity | 06/2023 | |||
| Previous 166 167 168 169 170 Next | |||||||||