Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 42744 |
Those RGPs whose status is cancelled or rejected will be receipt date |
Dimple Kumar , 52392 |
Lawkush ram , 44960 |
Those RGPs whose status is cancelled or rejected will be receipt date are coming | we check point with SAP team If RGP is cancelled /Reject then Receipt date will not update. business impacts-There will be no unwanted data in the system | 07/2025 | ||
| 2 | LCIK - 42837 |
Third floor canteen side air shower controlling and wiring modification |
Anuraj Gupta , 51009171 |
Vijendra Kushwaha , 51010306 |
third floor air shower is installed and after operation time is found that is air shower working direction is worng due to direction is worng and vendor is suggested to roted the air shower, but is time consumable and long work | So I have changed all wiring direction and some modifications on controing wiring after that the air air shower rotation has been oky as per requirement also we given on time as per given time | 07/2025 | ||
| 3 | LCIK - 39083 |
Thermal silika jel Automation |
Amit Kumar Prajapati , 51009104 |
Presently semiatomation is used to apply thermal silica. | If atomization is done then the defects of thermal silica will be reduced. | 11/2023 | |||
| Previous 160 161 162 163 164 Next | |||||||||