** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 42744
Those RGPs whose status is cancelled or rejected will be receipt date
Dimple Kumar , 52392
Lawkush ram , 44960
Those RGPs whose status is cancelled or rejected will be receipt date are coming we check point with SAP team If RGP is cancelled /Reject then Receipt date will not update. business impacts-There will be no unwanted data in the system 07/2025
2 LCIK - 42837
Third floor canteen side air shower controlling and wiring modification
Anuraj Gupta , 51009171
Vijendra Kushwaha , 51010306
third floor air shower is installed and after operation time is found that is air shower working direction is worng due to direction is worng and vendor is suggested to roted the air shower, but is time consumable and long work So I have changed all wiring direction and some modifications on controing wiring after that the air air shower rotation has been oky as per requirement also we given on time as per given time 07/2025
3 LCIK - 39083
Thermal silika jel Automation
Amit Kumar Prajapati , 51009104
Presently semiatomation is used to apply thermal silica. If atomization is done then the defects of thermal silica will be reduced. 11/2023
 Previous  160  161  162  163  164 Next