Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39680 |
Time Saving |
Alok yadav , 51009702 |
Man Singh , 51009389 Sunny Kumar , 51009334 |
02/2024 | ||||
| 2 | LCIK - 41569 |
Time Saving |
Alok yadav , 51009702 |
Atul Kumar Patel , 30195 Ajay Bahadur , 30067 |
IQC checking all LCR reels of all models 100% with LCR meter which causes delay in clearing material. | Old model and Feature phone LCR reel will be checked at 10% and in case of NPI and new material IQC will check all LCR reels 100% with the help of LCR meter. | 09/2024 | ||
| 3 | LCIK - 39875 |
time saving |
Pradeep pal , 51008628 |
, 51010424 |
Earlier we opened the system with the help of key board due to which sometimes it took extra time to open the system due to which it took extra time to open the system during changeover or there was loss of production or due to which we had downtime. | Now we use a 2D barcode which is scanned by the scanner with the help of which the time taken to open the system is reduced or the system is opened without the keyboard or there is no loss of production. | 03/2024 | ||
| Previous 158 159 160 161 162 Next | |||||||||