Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37817 |
To eliminate Flash LED Sifted Issue |
Pawan Singh Negi , 51009668 |
Gautam kumar , 44148 |
At present 2 manpowers are working on Inspect middle cover and remove vinyl of middle cover and finger print and than operator fix Flash LED and fix finger prrint sensor. Both manpower do same work and due to this both manpower can not check any specific point after done their process | Now we have distribute work between both operators one is doing fix flash PCBA and second operator work to fix finger print sensor Now finger print sensor person can check Flash LED PCBA mounting | 01/2023 | ||
| 2 | LCIK - 37574 |
TO CONTROL NO POWER ON ISSUE IN BLAZE NXT. |
SOMSHANKAR PATEL , 51009707 |
Vinod sapehia , 51008613 Janaki Ballav Pattanaik , 51009457 |
Due to auto pulling system enable no color identified in system . | now we have remove the auto pulling system and provide color identification after SW 100% done . After SW done yellow color highlighted in system . | 12/2022 | ||
| 3 | LCIK - 38525 |
To Clear the Bottleneck on enhancing the Capacity of Blaze 1X 5G Process Distributed between 3 Manpo |
Manoj Kumar , 51009924 |
Jamvant yadav , 44808 Amit Kumar Prajapati , 51009104 |
04/2023 | ||||
| Previous 150 151 152 153 154 Next | |||||||||