** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 41151
Yuva 5G RF test by IQstream 5G Tester.
Sachin yadav , 51009625
The Yuva 5G Unisoc chipset vendor is asking to use the CMW100 for RF testing. We don't have cmw100 for this test. We now work with the Lightpoint team to investigate Unisoc RF testing using IQstream 5G testers. After the modification setup with the ODM tool we are now using our IQStream tester for the Unisoc chipset. 08/2024
2 LCIK - 39530
Yuva 3 FT manpower optimization
Amit Pratap Singh , 51009908
Before the process was as per given below 1. P/L sensor, Gravity sensor and finger print sensor test 2. Gsensor calibration and magnetic sensor test & GPS test Before total FT manpower was 15 Now we merged both process & saved 1 M/P P/L sensor test, Gravity sensor Test, Finger print test & G sensor Calibration, magnetic sensor test & GPS test ( 1 M/P ) Now FT manpower is 14 & same we will implement in other similar smart phone 01/2024
3 LCIK - 40939
Yuva 2 pro Line Balance
Sachin yadav , 51009625
By getting the battery scanned at the battery pressing stage, both the stages will be balanced. Model- Yuva 2 pro Stage- Unpack Battery & Scan Battery Fix Battery Connector & Fix Battery Scanning also had to be done at the battery fixing stage due to which accumulation takes place 07/2024
 Previous  13  14  15  16  17 Next