Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 39825 |
Stop unauthorised entry of person on floor |
Priyamjit Paul , 51009135 |
At present no any check of authorised person on gate of 3rd floor or 1st floor. Anybody wearing an apron can enter any floor either he is working or not working on the floor. No any permission is required of anybody and a person can enter easily on floor. | All employee working on each floor should have a floor specific entry card which will be checked by the Guard during entry check of the employee on floor and only who are authorised on the card for the specific floor will be allowed and if any requirements is there then hae to take permission from floor incharge. | 03/2024 | |||
2 | LCIK - 39042 |
Stop screw fall down on conveyor platform from manual screwing stage |
Anuj Yadav , 51010109 |
10/2023 | |||||
3 | LCIK - 40955 |
Stock Transfer Automation | Direct FG Dispatch |
Dimple Kumar , 52392 |
Lalit Kumar Bansal , 58214 |
FG on pallet is send to LM01 from Production floor and from there we received material through STI, in this 5 to 10 pallets are send to MWNO on single STI. | After we Automation Direct FG handsets Dispatch to MNOW team and According to new process single-single pallets with Tech ID/pallet ID will be send directly to MWNO from production floor. Save the Time, Paper, Space, also manpower | 07/2024 | ||
Previous 142 143 144 145 146 Next |