Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 40568 |
Yuva 5G RF test by IQstream 5G Tester. |
Anuj Kumar Yadav , 51008899 |
SANJAY RUPANI , 51009511 Teetoo kumar , 51008357 |
The Yuva 5G Unisoc chipset vendor is asking to use the CMW100 for RF testing. We don't have cmw100 for this test. | We now work with the Lightpoint team to investigate Unisoc RF testing using IQstream 5G testers. After the modification setup with the ODM tool we are now using our IQStream tester for the Unisoc chipset. | 05/2024 | ||
2 | LCIK - 41151 |
Yuva 5G RF test by IQstream 5G Tester. |
Sachin yadav , 51009625 |
The Yuva 5G Unisoc chipset vendor is asking to use the CMW100 for RF testing. We don't have cmw100 for this test. | We now work with the Lightpoint team to investigate Unisoc RF testing using IQstream 5G testers. After the modification setup with the ODM tool we are now using our IQStream tester for the Unisoc chipset. | 08/2024 | |||
3 | LCIK - 39530 |
Yuva 3 FT manpower optimization |
Amit Pratap Singh , 51009908 |
Before the process was as per given below 1. P/L sensor, Gravity sensor and finger print sensor test 2. Gsensor calibration and magnetic sensor test & GPS test Before total FT manpower was 15 | Now we merged both process & saved 1 M/P P/L sensor test, Gravity sensor Test, Finger print test & G sensor Calibration, magnetic sensor test & GPS test ( 1 M/P ) Now FT manpower is 14 & same we will implement in other similar smart phone | 01/2024 | |||
Previous 12 13 14 15 16 Next |