** ***** Give Kaizen on Theme - Near Miss & win exciting prizes ! *****

Kaizen Corner

Sr. No Kaizen No Kaizen Theme Initiator Team Before
Situation
After
Situation
Month
1 LCIK - 37252
TP lcd room and toilet supply separation work
Mukesh kumar arya , 51009476
Sharan Ojha , 59383
tp lcd room ahu fire damper and one toilet room supply was connected to same mcb due to which due to some electrical fault in toilet room supply was going off at all places now. Supply has been given through a new circuit so that the damper of LCD room and AHU room does not stop again and again, due to which the production in the power system will not stop. 11/2022
2 LCIK - 36494
TP ASSEMBLY ROOM INSTRUCTION CHART OF SEFTEY
Deepak kumar , 166287
Rishabah , 44155
TP ASSEMBLY ROOM ME TROLLY PAR MATERIAL KO WALL SE CHIPKA KE RAKANE AND UTARANE SE WALL PAR BLACK SPOT AA JATA HAI AND PENTS CHHUT JATA HAI AND LAGE HUYE GLLASS PAR BHI MATERIAL BIN touch HOTA HAI AND SCRATCHS AA SAKATA HAI AGER HAM US ROOM ME SEFTEY KA instruction chart LAGA DETE HAI TO MATERIAL TROLLY AND BIN KO SAHI tarah SE RAKHA JAYEGA 08/2022
3 LCIK - 40742
TP & LCD cost saving.
Vipin kumar singh , 51008102
We have remove any Tp LCD smart phone that gets scraped for LCD B2B conn. Damage. & if PCBA B2B conn. Damage Then We have repaired easily. LCD B2B conn. is easily Changed by L4 repair Engineer. We can Take Help of SMT repair engg. And save the scrap and also company cost. 06/2024
 Previous  129  130  131  132  133 Next