Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 37252 |
TP lcd room and toilet supply separation work |
Mukesh kumar arya , 51009476 |
Sharan Ojha , 59383 |
tp lcd room ahu fire damper and one toilet room supply was connected to same mcb due to which due to some electrical fault in toilet room supply was going off at all places | now. Supply has been given through a new circuit so that the damper of LCD room and AHU room does not stop again and again, due to which the production in the power system will not stop. | 11/2022 | ||
| 2 | LCIK - 36494 |
TP ASSEMBLY ROOM INSTRUCTION CHART OF SEFTEY |
Deepak kumar , 166287 |
Rishabah , 44155 |
TP ASSEMBLY ROOM ME TROLLY PAR MATERIAL KO WALL SE CHIPKA KE RAKANE AND UTARANE SE WALL PAR BLACK SPOT AA JATA HAI AND PENTS CHHUT JATA HAI AND LAGE HUYE GLLASS PAR BHI MATERIAL BIN touch HOTA HAI AND SCRATCHS AA SAKATA HAI | AGER HAM US ROOM ME SEFTEY KA instruction chart LAGA DETE HAI TO MATERIAL TROLLY AND BIN KO SAHI tarah SE RAKHA JAYEGA | 08/2022 | ||
| 3 | LCIK - 40742 |
TP & LCD cost saving. |
Vipin kumar singh , 51008102 |
We have remove any Tp LCD smart phone that gets scraped for LCD B2B conn. Damage. & if PCBA B2B conn. Damage Then We have repaired easily. | LCD B2B conn. is easily Changed by L4 repair Engineer. We can Take Help of SMT repair engg. And save the scrap and also company cost. | 06/2024 | |||
| Previous 129 130 131 132 133 Next | |||||||||