Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 37582 |
Test sequence for led test updated in tool in first location . |
Vinod sapehia , 51008613 |
SOMSHANKAR PATEL , 51009707 Janaki Ballav Pattanaik , 51009457 |
Before led glowing at 32th sequence in the tool, during this location operator facing visibility issue during manual test. | Now sequence updated at 1st location.Due to this implementation manually identification is easy for led test because first led is glowing due to tool modification. | 12/2022 | ||
2 | LCIK - 38721 |
Test Battery Machine |
Amit Kumar Prajapati , 51009104 |
There is no test machine to check test battery on line | There should be a machine to test the test battery on the line. So that OK and NG battery can be detected Due to which only ok test battery will run on line par which will improve productivity | 06/2023 | |||
3 | LCIK - 40925 |
Temperature Related safety. |
Sujit kumar Pandey , 51009483 |
Mukesh kumar arya , 51009476 Sharan Ojha , 59383 |
Earlier there was no AHU supply duct in UPS room 2, due to which standby AC had to be run and the temperature could not be maintained. | 07/2024 | |||
Previous 128 129 130 131 132 Next |