Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 39844 |
Tin shed installed in receiving unloading and loading areas dock area |
Dimple Kumar , 52392 |
Chandana Malika , 30158 Nand kumar , 51009969 |
No Tin shed installed in receiving unloading and loading areas dock area | The tin shed protects the material from rain and dust | 03/2024 | ||
2 | LCIK - 36559 |
Time study Format |
Amit Pratap Singh , 51009908 |
08/2022 | |||||
3 | LCIK - 39225 |
Time Stamp issue |
Pawan Kumar Yadav , 51010085 |
Janaki Ballav Pattanaik , 51009457 |
Before no Time stamp option available in MES to track the fg confirmation | Now Time stamp option added in MES to track the fg confimation | 11/2023 | ||
Previous 121 122 123 124 125 Next |