Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
1 | LCIK - 36855 |
To eliminate the MPN issue at MC01/PKG1 |
, 59748 |
, 64872 Dimple Kumar , 52392 |
We were doing the scanning for MPN check at MC01/PKG1 location only. Therefore MPN issues part was coming from stores & catching at MC01 scanning system only. So inventory accumulation/MRN was increased at floor for MPN mismatches parts. | Now We have implemented a check at Store MES system to caught the MPN issues. Now no MRN/inventory accumulation at floor due to MPN issues. | 09/2022 | ||
2 | LCIK - 36323 |
To eliminate the FG PCBA damages |
Gyanendra singh verma , 44099 |
Manoj tiwari , 44033 Amit Kumar , 44542 |
We have observed PCBA FG bin fall down issue from trolleys due to stuck in curtains during movement. | We have implemented belt tie system on FG bins in trolleys. After that no fall down from trolleys during movement. We have 100% safe movement of FG without any quality issues of damages. | 07/2022 | ||
3 | LCIK - 37208 |
To Eliminate the consumptions issue in order |
, 59748 |
Pavan Kumar , 51009105 Rajiv Kumar , 59449 |
We have observed several orders manual changed & with consumptions less/excess due to manual editing. So it was creating mismatches on floor. These order identification time was more than 1 hour/order & unnecessary was happening if order was okay. | 11/2022 | |||
Previous 113 114 115 116 117 Next |