Kaizen Star - Plant 1
Aakash Reddu
April - 2024
Total1
| Sr. No | Kaizen No | Kaizen Theme | Initiator | Team | Before Situation |
After Situation |
Month | ||
| 1 | LCIK - 39498 |
use rf cable extentaion for rf cable safety |
Sumant Kumar Yadav , 51009654 |
chandra shekhar , 51009333 Ashish Kumar , 51009464 |
01/2024 | ||||
| 2 | LCIK - 39432 |
Use of USB hub at RF stage. |
Vinay Shekhar , 59429 |
At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production. | We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred. | 12/2023 | |||
| 3 | LCIK - 43210 |
Use of USB hub at RF stage. |
Shyam Singh , 51010637 |
Ashish Kumar Patel , 51009176 Udaybhan Mishra , 51009650 |
At RF sage mostly PC ports get blocked due to which PC was restarted or it get changed. This process of troubleshooting consume more time due to which it impact on production. | We have tried by installing the USB hub in OK ports it work as multiple ports and RF PV working fine after doing ports. due to which no loss will occurred. | 10/2025 | ||
| Previous 99 100 101 102 103 Next | |||||||||