Kaizen

Back

HOD ok
by : Sunny

KPO: ok
by : Sunny

CI: OK
by : Avadhesh

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

We are collaborating with the SAP team to develop the ZPP_BOM T-code, which will provide a comprehensive report of BOM parts in a single run. This will greatly enhance our reporting capabilities.

Before Situation

Previously, we used to manually check each tool one by one with the help of FG code line item in SAP. This process was time-consuming and took more than one hour to find the report.

After Situation

We are collaborating with the SAP team to develop the ZPP_BOM T-code, which will provide a comprehensive report of BOM parts in a single run. This will greatly enhance our reporting capabilities.

Kaizen Start Date

01-09-2023

Kaizen End Date

05-09-2023

Result

Productivity

Cost Calculation Sheet
Improvement Details