Kaizen

Back

HOD ok
by : Manoj Kumar Satyawali

KPO: ok
by : Manoj Kumar Satyawali

CI: OK
by :

Team Member - 1
Team Member - 2
HOD
KPO
CI Team
Finance
Kaizen Theme
Kaizen Description

Power cable had been laid with out raceway. due to which was chance of cable cut and which was unsafe. Now installed the pvc raceway duct and cable is inside the duct.

Before Situation

Power cable had been laid with out raceway. due to which was chance of cable cut and which was unsafe.

After Situation

Now installed the PVC raceway duct and cable is inside the duct.

Kaizen Start Date

08-10-2022

Kaizen End Date

08-10-2022

Result

Safety

Cost Calculation Sheet
Improvement Details Download File